Emery Sapp & Sons has been building Missouri's infrastructure for over 30 years. Our experience ranges from building railroad bridges for the Army Corps of Engineers to constructing highways and bridges for the Missouri Department of Transportation to installing sewer and waterlines for municipalities to paving airports. You may view the details of some of our recent public works projects by selecting them from the list below. |
| Selected Public Works Projects | Click on the project name to view complete details. |
|
Columbia, MO
|
4 Miles of 36in reinforced concrete transmission water line. Includes three deep bores under Perche and Hinkson Creek that required sheet pile cofferdams and deep wells for dewatering. |
|
Columbia, MO
|
New interchange with Highway 63 and Gans Road with new bridge over Highway 63. |
|
Van Buren, MO
|
Twelve span, steel and pre-cast concrete, girder bridge. Built to mitigate damage from an earthquake and preserve the water quality of the scenic Current River in Van Buren Missouri. |
|
Columbia, MO
|
.8 miles of minor arterial roadway from Scott Blvd. west to Gillespie Bridge Road with sidewalks, pedways, and new arch bridge. |
|
Columbia, MO
|
The new COLT bridge will be located east of the existing tracks. |
|
Branson, MO
|
The new Fall Creek extension connects Highway 76 with James Epps Road at the Roark Valley intersection. The three lane road will allow motorists to travel from Highway 248 all the way south to Missouri Highway 165 by the Fall Creek Steakhouse. Highway 165 continues to Table Rock Dam. Fall
Creek Road provides another major north /south thoroughfare through Branson.
|
|
Springfield, MO
|
Relieving congestion at the intersection of I-44 and Rt. 65 with an emphasis on speed. The new fly over bridge provided safe travel for commuters and was completed well within time requirements. |
|
Columbia, MO
|
This project will consist of new street pavement and two bridges from the existing Maguire Boulevard northward to Stadium Boulevard. |
|
Columbia, MO
|
This project will consist of new street pavement from Vandiver Drive to Blue Ridge Road, construction of a new multi-span bridge over Bear Creek and new sidewalks. |
|
Columbia, MO
|
The project will consist of widening the street to four lanes plus a center median from Rollins Road to Brookview Terrace, which is approximately 10,000 feet in length. |
|
Columbia, MO
|
This project will consist of new street pavement from the Mexico Gravel Road to Vandiver Drive with two new roundabouts--one at Vandiver Drive and the other at Mexico Gravel Road, and new sidewalk. The project will also include new sewer for the Upper Hinkson Creek area. |









